Form

Experienced Worker Assessment

Skills Scan

To be completed by the candidate


    Safe Isolation and Risk Assessment

    To demonstrate occupational competence, you will be expected to:

     
    For each item please tick one box in the Knowledge section and one box in the Experience section

     
    KNOWLEDGE
    EXPERIENCE

    Carry out and document an assessment of risk

    Carry out safe isolation in the correct sequence on a single-phase circuit

    Carry out safe isolation in the correct sequence on a three-phase circuit

    Carry out safe isolation in the correct sequence on a three-phase installation

    [cf7mls_step cf7mls_step-1 "NEXT" "STEP 1"]
    Installation

    This section has areas where you will need to demonstrate occupational competence in accordance with statutory and non-statutory regulations and approved industry working practices.

     
    For each item please tick one box in the Knowledge section and one box in the Experience section

     
    KNOWLEDGE
    EXPERIENCE

    Interpretation of specifications and technical data
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Selection of protective devices
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install protective equipotential bonding
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate PVC singles cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate PVC/PVC multi-core & cpc cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate SY multi-flex cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate heat-resistant flex
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate XLPE SWA
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate data-cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install and terminate FP200 type cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Forming and install 20mm metal conduit
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Forming and install 20mm PVC conduit
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Installation of at least three other wiring systems e.g. cable tray, trunking, cable ladder, cable basket, modular wiring, or busbar systems
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install protective devices in a TP&N distribution board
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install a two-way and intermediate lighting circuit in PVC/PVC multi-core cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install a BS 1363 13A socket outlet ring circuit in PVC singles cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install a carbon monoxide detector safety service circuit in FP200 type cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install data outlets circuit in Cat. 5 cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install a BS EN 60309 16A T P & N socket outlet in XLPE SWA cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install protective equipotential bonding to gas and water services
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Connect a 3-phase direct on line motor circuit in SY cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Install an S Plan central heating and hot water system with a solar thermal sustainable energy element utilising heat resistant flexible cable and PVC singles cable
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    [cf7mls_step cf7mls_step-2 "BACK" "NEXT" "STEP 2"]
    Inspection and Testing

    In this area you will be expected to follow practices and procedures that take into account electrically sensitive equipment. To demonstrate occupational competence, you will be expected to:

     
    For each item please tick one box in the Knowledge section and one box in the Experience section

     
    KNOWLEDGE
    EXPERIENCE

    Undertake an assessment of risk and work according to best practice as required by Health and Safety legislation
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Ensure the installation is correctly isolated before commencing the inspection and test activity
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Carry out a visual inspection of the installation in accordance with BS 7671 and IET Guidance Note 3
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Complete the following tests on the installation in accordance with BS 7671 and IET Guidance Note 3:
    1 Continuity of protective conductors
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    2 Continuity of ring final circuit conductors
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    3 Insulation resistance
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    4 Polarity
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    5 Earth fault-loop impedance (EFLI)
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    6 Prospective fault current (PFC)
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    7 Check for phase sequence and phase rotation
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    8 Functional testing
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Verify that the test results obtained conform to the values required by BS 7671 and IET Guidance Note 3
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Complete an electrical installation certificate, schedule of inspections and schedule of test results using the model forms as illustrated in Appendix 6 of BS 7671
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    [cf7mls_step cf7mls_step-3 "BACK" "NEXT" "STEP 3"]
    Fault Diagnosis and Rectification
     
    For each item please tick one box in the Knowledge section and one box in the Experience section

     
    KNOWLEDGE
    EXPERIENCE

    Undertake an assessment of risk and work according to best practice as required by Health and Safety legislation
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Correctly identify and use tools, equipment and test instruments that are fit for purpose
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Carry out checks and preparations that must be completed prior to undertaking fault diagnosis
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Identify faults from 'fault symptom' information
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    State and record how the identified faults can be rectified
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure

    Assessment of Applied Knowledge

    To demonstrate occupational competence you will be assessed on your knowledge of:

     
    For each item please tick one box in the Knowledge section and one box in the Experience section

     
    KNOWLEDGE
    EXPERIENCE

    Health and Safety
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    BS 7671: Requirements for Electrical Installations
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Building Regulations
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    Inspection, Testing and Fault Finding
    LimitedAdequateExtensiveUnsure
    LimitedAdequateExtensiveUnsure
    [cf7mls_step cf7mls_step-4 "BACK" "STEP 4"]